How is the composite geomembrane lapped?
2022 05/17
After the composite geomembrane is laid, it must be compacted with sandbags to prevent wind blowing. There must be no waste, water, dust, etc. on the edge of the joint. Before welding, the two sides of the single-layer film at the joint should be adjusted so that the steel rod overlaps within a certain width of the optical fiber, so that the steel rod is flat and wrinkle-free. When welding, professional technicians with certain welding work experience are preferred, and special welding machines are used for welding. Adjust the temperature and speed, (can also be glued). In strict accordance with the engineering construction technical standards, several quality control tasks such as preparation, laying, splicing, testing and backfilling shall be done.